dallas/faust fence construction, tooele County, ut

  • Scope of work involved the removal and replacement of 3.8 miles of sheep wire netted fence and 4.5 miles of standard barbwire fence, as well as end panels, stress panels, corner panels and drainage crossings

  • Project occurred at two remote locations in the Utah wilderness, more than75 miles from the nearest city

Woodside.jpg

antenna monitor pole replacement, woodside, ca

  • Scope of work included the replacement and installation of an antenna monitor pole near Woodside, CA

  • Work site located at a remote mountain-top area at 1,219’ elevation

  • Project included environmental measures including proper disposal of treated wood and measures to protect the endangered California Red Legged Frog during construction

Francis Peak.jpg

installation and weatherproofing of common air route surveillance radar (carsr) facility, francis peak, ut

  • Project required repairs to an FAA facility to prevent water intrusion and repair weather-related damage

  • Work site located at a remote location in the Wasatch Mountain Range at 9,560’ elevation