c-130 phase dock building 129, davis-monthan afb, az
Scope of work included the design and renovation of HVAC, plumbing, electrical, finishes and flooring for an existing hangar facility servicing C-130 aircraft
Project occurred adjacent to an active airfield, requiring close coordinate with installation personnel to ensure safety and security
Accommodated facility’s mission-critical activities by scheduling work at times that would not impact operations
consolidation of air force leadership school davis-monthan afb, az
Scope of work included design and construction services to consolidate and renovate the Air Force Leadership School
Newly renovated facility provided four seminar rooms, an auditorium, computer lab, office space and other support areas, in addition to building-perimeter systems to meet Anti-Terrorism/Force Protection (AT/FP) standards
Included hazardous abatement and demolition of Building 4101, in addition to hardscape ground cover, rip-rap and plantings
fire-alarm installation, buildings 519 and 539, tooele army depot, ut
Scope of work included design, engineering and construction of fire-alarm and detection systems in two separate buildings
Provided life-safety upgrades for more than 42,000 SF of building space
Occurred at a secure Army installation in accordance with all applicable safety and security requirements.